CNN
Get a quote →

// Projects › 05

// 05 · Structural re-engineering

Storage site — Houghton Regis, Bedfordshire

Route
Re-engineer & rebuild
Programme
Four months
Scope
New parapet, purlins & full microrib wall cladding
Defects reported
Zero to date
Completed re-engineered entrance with new parapet and cladding Entrance roof stripped back during re-engineering works
DuringComplete

Not every roof job is sheets-for-sheets. Here the client’s front entrance needed re-engineering, not recovering: the old entrance roof came off, hot-rolled steels (by others) formed a new parapet wall, and we installed cold-rolled purlins and galvanised top hats fixed to the purlins and the brickwork. Full microrib cladding went on to all the walls in the client’s own colour scheme, with a new insulated gutter concealed behind the parapet and replacement outer sheets to the entrance roof. Roofing, engineered — literally.

// Installed: Kingspan 45mm core microrib cladding panels · composite insulated gutter · Firth Steels roof sheets, parapet sheets & flashings · Fixing Point fixings & sealants

On video

// client name withheld on the open web · full named reference available on request

Your roof could be next.

It starts with a survey — walked on foot by the people who’d do the work, priced fixed on paper. You keep the report either way.

Book a survey  →